Customization: | Available |
---|---|
Application: | Work Platform |
Lift Mechanism: | Rack&Pinion |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Gaoli Double Mast Climbing Working Platform
1. Description
Aerial work platform s also called as mast climbing work platform, which is driven by motor and gear on rack, and moves up and down along the guiding mast. It is mainly composed of driving unit, chassis, mast sections, tripod deck, guardrails, tie-ins, electric control parts etc. And has the advantages such as no precast foundation, heavy lifting capacity, high working efficiency, wide working area, great security, etc. If can lift the passengers and goods exactly to the height needed, meanwhile allowing1-6 staff working on it. Mast climbing work platform suits for construction projects such as glass wall installation in air, outside wall decoration, celling installation and wire casing fixing work, because it work stable and safe, easy to install and replacing suspended platform and scaffolding platform in some areas.
2.Use and features
Length and width can be changed according to customer's requirements.
Convenient for installation and movement
Overload device and auto balance device included
Synchronized running device
Emergency stop pushbuttons and travel limit switched
Constant speed safety device included to prevent the platform from sliding down over speed
Equipped with manual landing system, which allows the platform to be drive down manually while electric power off.
Technical Data | |
Platform Length Range | 8.1~23.1m |
Platform Width | 1.5m |
Max.Freestanding Height | 10m |
Distance Between Anchors | 6m |
Max. Height with Mast Anchored | 150m |
Max.Mast Height Above Last Anchor | 3m |
Max. Quantity of Passengers | 6 |
Lifting Speed | 7m/min |
Max.Loading Capacity | 3500kg |
Mast Sections | 1.5m/90kg |
Motor Power | 2*2*2.2KW |
Supply Voltage | 3phase/380-415V |
3.Application
Facade work
Bricklaying
Balcony work
Window installation
Shipyard work
Bridge work
4.Company profile:
Established in August 2003, GAOLI Engineering Machinery Co., Ltd is headquartered at Tongjing Town of Jiangning District, Nanjing, covering an area of 36,000 square meters, and a construction area of 20,000 square meters.
GAOLI will continue to adhere to the business philosophy of "Customer Supreme, Quality First and Pursuit of Excellence", form an interest community with customers and partners, and bring GAOLI brand, capital, and technology and market strength into full play to further improve service quality and capability, providing customers with high quality and technologically advanced products and services.
"To achieve your dreams, we will continue our efforts!"
5.FAQ
Q: Are you factory?
A: Yes, we are a factory that located in Nanjing for over 10 years
A: It is according to the machine you need.
A: Each packed in carton, then put in wooden case, and then in container.
A: We own high-quality, reasonable price. If purchase now,
We will supply you one set assembly auxiliary tools and one set wearing parts.
A: We warmly welcome your visiting!